 |
| |
ASSEMBLY LINE :
Block construvtion techniques are applied
through an assembly line approach.

Plate Cutting : CNC
is utilised for plate cutting, closed modern facilies of
ADIk ensures optmimum utilisation of resources.

Profile Assembly

Block Construction
- Handling, Lifting Equipment : All closed areas
and open weather slipways are fitted with handling and
lifting equipment.

- Welding Technology : State of art welding
techniques, deformation control techniques are utilised
and continously updated.
* Deformation control is given a special emphasis,
for panel production
* Accuracy Control is achieved with the state of
arttechnologies.

- Assembly : Block contruction is the main
methodology of ship production

- Outfitting (Planing stage) : Outfiiting is utilised
in the block construction stages.

Modular Construction :
Modular construction techniques are utilised to reduce
outfitting time of the ship contruction.

Painting (Planing stage)

ERP : ENTERPRISE RESOURCES
PLANNING
Warehouse-Stockyard
ADIK has well established warehouse/stockyard
facilities entegrated by ERP approach.

Covered Building Arena
ADIK is one of the shipyards in Tuzla region with
largest closed building area. The closed building area
is equipped with cranes, and utilised for block
construction with outfitting, in addition to small ship
construction. Mega Yachts, small workboats, Tugs,
patrols can be built in multiple numbers within the
enclosed area.

- Building Slipways
Outdoor slipways are utilized for larger size ship building.
The outdoor facilities are utilized in full efficiency for assembly
line production.

- Shipyard Premises
General arrangement of shipyard enables efficient use of
ERP in most efficient way.

- PDM/PLM : Product Data
Management/Product Lifecycle Management is utilised for
Ship configuration management. The experience of
FURTRANS for ship maintability and repairability is
transferred into shipyard activities.
|
|